Model comparison

Compare models or reasoning efforts by score, evaluation time and estimated cost.

Measured results

Differences are relative to the first column
Tested configuration
Effort
Effort
Quick select

claude-opus-4-8Backend −17 pts · Frontend +7 pts

Metricgrok-4.6 · xhighclaude-opus-4-8 · xhigh
Overall
76.85
76.80−0.05 pts
Backend engineering
78
61−17 pts
Frontend interaction
80
87+7 pts
Knowledge & reasoning
85
90+5 pts
Visual aesthetics
64
68+4 pts
Maintainability
59
55−4 pts

Cost & time

Complete evaluation
Metricgrok-4.6 · xhighclaude-opus-4-8 · xhigh
Reference cost
$2.51
$9.18+$6.66
Evaluation time
144m 16s
102m 10s−29.2%

Dimension breakdown

Expand to inspect each subaxis.

Backend engineeringSubscores
Scoring dimensiongrok-4.6xhighclaude-opus-4-8xhigh
Contracts and boundaries12 / 207 / 20
Retries and failures18 / 2016 / 20
CI and adversarial review14 / 2011 / 20
Transactions and consistency17 / 2015 / 20
Caching and regression17 / 2012 / 20
Frontend interactionSubscores
Scoring dimensiongrok-4.6xhighclaude-opus-4-8xhigh
Layout and adaptation18 / 2020 / 20
Interaction behavior20 / 2020 / 20
State continuity15 / 2020 / 20
Accessibility and feedback12 / 1512 / 15
State validation and regression15 / 2515 / 25
Knowledge & reasoningSubscores
Scoring dimensiongrok-4.6xhighclaude-opus-4-8xhigh
Mathematical reasoning10 / 1515 / 15
Computer science & AI15 / 1510 / 15
Science and engineering10 / 1010 / 10
Life sciences and medicine15 / 2020 / 20
Humanities and general knowledge35 / 4035 / 40
Visual aestheticsSubscores
Scoring dimensiongrok-4.6xhighclaude-opus-4-8xhigh
Composition20 / 2020 / 20
Spacing and alignment15 / 2016 / 20
Typography and expression16 / 2017 / 20
Color and surfaces20 / 2019 / 20
Control styling15 / 2016 / 20

Subscores retain their original scale; the axis score uses a consistent conversion.

MaintainabilitySubscores
Scoring dimensiongrok-4.6xhighclaude-opus-4-8xhigh
Semantic clarity15 / 2015 / 20
Control-flow organization20 / 2019 / 20
Locality of changes15 / 2015 / 20
State and lifecycle17 / 2016 / 20
Implementation economy17 / 2017 / 20

Subscores retain their original scale; the axis score uses a consistent conversion.