Model comparison

Compare models or reasoning efforts by score, evaluation time and estimated cost.

Measured results

Differences are relative to the first column
Tested configuration
Effort
Effort

Comparing tested effort levels of the same model

muse-wonder · maxReasoning +10 pts · Backend +5 pts

Metricmuse-wonder · xhighmuse-wonder · max
Overall
77.05
81.55+4.5 pts
Backend engineering
77
82+5 pts
Frontend interaction
85
84−1 pts
Knowledge & reasoning
80
90+10 pts
Visual aesthetics
73
73Tied
Maintainability
57
59+2 pts

Cost & time

Complete evaluation
Metricmuse-wonder · xhighmuse-wonder · max
Reference cost
$5.11
$6.78+$1.67
Evaluation time
30m 45s
40m 8s+30.5%

Dimension breakdown

Expand to inspect each subaxis.

Backend engineeringSubscores
Scoring dimensionmuse-wonderxhighmuse-wondermax
Contracts and boundaries15 / 2018 / 20
Retries and failures18 / 2019 / 20
CI and adversarial review13 / 2012 / 20
Transactions and consistency17 / 2018 / 20
Caching and regression14 / 2015 / 20
Frontend interactionSubscores
Scoring dimensionmuse-wonderxhighmuse-wondermax
Layout and adaptation18 / 2018 / 20
Interaction behavior20 / 2020 / 20
State continuity15 / 2010 / 20
Accessibility and feedback13 / 1513 / 15
State validation and regression19 / 2523 / 25
Knowledge & reasoningSubscores
Scoring dimensionmuse-wonderxhighmuse-wondermax
Mathematical reasoning15 / 1515 / 15
Computer science & AI5 / 1515 / 15
Science and engineering10 / 1010 / 10
Life sciences and medicine15 / 2015 / 20
Humanities and general knowledge35 / 4035 / 40
Visual aestheticsSubscores
Scoring dimensionmuse-wonderxhighmuse-wondermax
Composition20 / 2019 / 20
Spacing and alignment17 / 2017 / 20
Typography and expression18 / 2018 / 20
Color and surfaces19 / 2019 / 20
Control styling16 / 2017 / 20

Subscores retain their original scale; the axis score uses a consistent conversion.

MaintainabilitySubscores
Scoring dimensionmuse-wonderxhighmuse-wondermax
Semantic clarity15 / 2015 / 20
Control-flow organization19 / 2020 / 20
Locality of changes15 / 2015 / 20
State and lifecycle17 / 2017 / 20
Implementation economy17 / 2017 / 20

Subscores retain their original scale; the axis score uses a consistent conversion.